Summary

The invention is to load-shift time-deferrable devices by placing an electrical load scheduling mechanism in communication with an appliance. Delivery of electrical power to the appliance is scheduled via the electrical load scheduling mechanism based on assessed electrical grid load conditions. The scheduling includes altering a predetermined delivery of electric power to the appliance based on the assessed electrical grid conditions

Status

UBD Ref No: U11    Status: Granted

Inventors: Tanuja Hrishikesh Ganu, Shivkumar Kalyanaraman, Devasenapathi Periagraharam Seetharamakrishnan, Liyanage Chandratilak De Silva

Documents: U11 G US, BN/2012/0009, US 13/445645, US 2013/0274945, US 9,748,771

  • United States

    Filed: Apr 12, 2012

    Granted: Aug 29, 2017